How to Apply for New Electricity Meter Online
Apply for New Electricity Meter Online 2026 is a convenient option for people building new homes, shops or offices in Pakistan. Electricity distribution companies provide online application facilities so consumers can request a new connection without repeatedly visiting their local offices. The application process, required documents and charges depend on the relevant electricity distribution company (DISCO). In this guide, you will learn how to submit an application, check its status, pay the demand notice and understand the charges under the latest available NEPRA Consumer Service Manual.
Quick Information Table
| Information | Details |
|---|---|
| Service | New Electricity Connection |
| Country | Pakistan |
| Regulatory Authority | NEPRA |
| Service Providers | LESCO, IESCO, MEPCO, FESCO and other DISCOs |
| Application Method | Online or through designated offices |
| Official ENC Portal | enc.com.pk |
| Required Document | CNIC and property ownership proof |
| Charges | Based on approved rates and connection requirements |
| Payment Method | Designated banks or available online facility |
| Last Date | No fixed deadline |
Overview of New Electricity Meter Connection
A new electricity connection allows property owners and eligible applicants to receive electricity at a residential, commercial or industrial property.
The Ministry of Energy confirms that distribution companies offer online application facilities through the Electricity New Connection (ENC) system. After receiving an application, the company’s representative may collect hard copies of the required documents during the site survey. power.gov.pk
Latest Updates on New Electricity Meter Applications 2026
According to NEPRA’s revised Consumer Service Manual dated November 26, 2025, distribution companies must follow the updated procedures for processing new electricity connections.
Applicants can submit applications online or in person, receive a tracking number and obtain demand notices for applicable connection charges and security deposits.
However, online application arrangements differ between distribution companies. For example, IESCO has announced a shift from ENC to its e-OPS system and directs consumers to its Power Smart or IESCO Smart App or Customer Facilitation Centres. Nepra+2
Eligibility Criteria for a New Electricity Meter
Who Can Apply?
The following applicants can request a new connection:
- Owners of newly constructed houses.
- Owners of shops and commercial buildings.
- Eligible tenants with the required owner’s authorization.
- Industrial property owners.
- Applicants requiring a separate electricity connection.
Required Conditions
Applicants must provide valid identification, proof of ownership or authorized occupancy, and other documents required by their distribution company.
Benefits of Applying Online
- Submit applications without repeated office visits.
- Receive a tracking or case number.
- Check application progress.
- Receive demand notices.
- Access available online payment facilities.
- Reduce paperwork and improve application tracking.
Required Documents for a New Electricity Meter
Prepare the following documents before applying:
- Copy of the applicant’s valid CNIC.
- Property ownership documents.
- Recent property tax or ownership record, if required.
- Electricity connection application form.
- Wiring test report from an authorized electrician, where applicable.
- Owner’s authorization or NOC for tenants.
- CNIC copy of the property owner, where applicable.
- Mobile number and email address.
Additional documents may be required depending on the connection type and distribution company.
How to Apply for New Electricity Meter Online 2026
Follow these steps to submit your application:
Step 1: Visit the Official ENC Portal
Open the Electricity New Connection Portal. Check whether your distribution company accepts applications through this portal.
Step 2: Select Your Distribution Company
Choose your electricity provider, such as LESCO, GEPCO, PESCO, HESCO or another participating company. If your provider uses a separate system, visit its official website or application.
Step 3: Complete the Application Form
Enter your personal information, CNIC number, property address, connection category and required load.
Step 4: Upload Required Documents
Attach clear copies of your CNIC, ownership proof and other supporting documents.
Step 5: Submit Your Application
Review the information and submit the form. Save the application number or tracking ID for future reference.
Step 6: Site Inspection and Verification
The concerned distribution company reviews your application and may arrange a site inspection to check the property’s connection requirements.
Step 7: Receive the Demand Notice
After approval, the company issues a demand notice containing the applicable connection charges and security deposit.
New Electricity Meter Charges in Pakistan 2026
There is no single fixed price for a new electricity meter across Pakistan. The total cost depends on several factors:
- Residential or commercial connection category.
- Required sanctioned load.
- Security deposit.
- Connection and installation charges.
- Additional material or infrastructure requirements.
According to NEPRA’s Consumer Service Manual, applicants generally receive demand notices for connection charges and security deposits. The standard payment period is 30 days, with a possible 30-day extension upon request under the prescribed conditions. ke.com.pk+1
Always check the official demand notice instead of relying on estimated charges shared on social media.
How to Check New Electricity Meter Application Status
You can track your application using the tracking ID provided after submission.
- Open the relevant distribution company’s application portal.
- Select the application tracking option.
- Enter your tracking or case ID.
- Submit the information.
- Check the latest application status.
Frequently Asked Questions (FAQs)
1. Can I apply for a new electricity meter online in Pakistan?
Yes. Most distribution companies provide online application facilities through ENC or their own digital systems.
2. How much does a new electricity meter cost in 2026?
Charges depend on the connection category, sanctioned load, security deposit and installation requirements.
3. Which documents are required for a new electricity connection?
Generally, applicants need a CNIC, property ownership proof, application form and other documents required by their DISCO.
4. How long does it take to install a new electricity meter?
Installation time depends on the connection category, application verification, payment and infrastructure requirements. NEPRA’s manual specifies applicable service timelines.
5. Can tenants apply for a new electricity meter?
Yes, tenants may apply subject to the required owner’s authorization and supporting documents.
Conclusion
Applying for a new electricity connection in Pakistan has become more convenient through online services offered by distribution companies. The Apply for New Electricity Meter Online 2026 process allows consumers to submit applications, upload documents and track their requests digitally. However, applicants should first confirm which portal their electricity provider uses because procedures can differ between companies. Prepare your documents, check the applicable charges and pay only through authorized channels. Always use official DISCO websites and follow the latest NEPRA guidelines to avoid unnecessary delays.